![tandem crane lift plan tandem crane lift plan](https://cc-production-uploads-bucket.s3.amazonaws.com/uploads/2019/11/Simulator-Tandem-Lift-Scenario-CMYK-mainweb.jpg)
“Any time we do a two-crane pick, we have two crews we will put on the job.” (16 329 kg) and lifted and placed on the center rotating joint,” said Norris. In order to combat this problem, the machine was placed on higher ground - making the lift possible. The HTC-86110 had a counterweight of more than 48,000 pounds, while the ATC-3275 had to reach 15 feet further. Then we were set up along with the ATC-3275 so we could pick the bridge and set it into place.”Īfter the planning process and everything was in place, Anglemyer Crane Rentals completed the lift without any hitches. “A temporary ramp was built for us to get the HTC-86110 down into the pond. “It was a little bit of a unique setup,” said crane operator, Mike Norris, who ran the HTC-86110. In order to complete this heavy lift, Anglemyer Crane Rental had to simultaneously operate two heavy-duty cranes - a difficult task. The bridge is used to circulate water in a sediment pond for the industrial production of sand. In a press-release, Link-Belt reported that an HTC-96110 hydraulic truck crane and an ATC-3275 all-terrain crane were used to complete a 155 foot long, 60,000 pound refurbished water bridge. NOTE: the above guidance applies only to certain lifts with parallel crane movements but not to tandem lifts where the load is picked in front of the crane and set down between the cranes. Recently, Anglemyer Crane Rental utilized two Link-Belt cranes to successfully implement a tandem lift on a refurbished water bridge. Eng.: This lift plan is in conformance with all applicable standards and regulations, and accepted best.
#Tandem crane lift plan trial#
This innovative procedure is used throughout the crane industry in various projects. Trial Lift / Rescue Simulation for Crane Operator & Ground Personnel completed Emergency Rescue Plan reviewed with Lift Team and Rescuers Section 15 - Lift Plan Sign-off Lift Classification: Standard Lift Non-Standard Lift Critical Lift P. The process includes more than two cranes, hoists or pieces of lifting equipment to complete a successful tandem lift. It is no secret that tandem lifts can be beneficial, increasing the rated capacity of a lift by 75 percent.